Consultancy services for Authority’s Engineer for Supervision of Widening/Improvement to 4 (Four) Lane with Paved Shoulder of Daboka – Khatkhati stretch of NH-29 of Package 5, starting from Near Ganpath Gaur Gaon at Km 95+400 to Kwaram Taro village at Km Read more about Consultancy services for Authority’s Engineer for Supervision of Widening/Improvement to 4 (Four) Lane with Paved Shoulder of Daboka – Khatkhati stretch of NH-29 of Package 5, starting from Near Ganpath Gaur Gaon at Km 95+400 to Kwaram Taro village at Km
Consultancy Services as Authority’s Engineer for Supervision of Improvement & Widening of existing NH-08 from Champaknagar to Khayerpur to Four lane with paved shoulder (design Km 242+500 to Km 261+610) in the state of Tripura on EPC basis Read more about Consultancy Services as Authority’s Engineer for Supervision of Improvement & Widening of existing NH-08 from Champaknagar to Khayerpur to Four lane with paved shoulder (design Km 242+500 to Km 261+610) in the state of Tripura on EPC basis
Independent Engineer services for supervision of Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch.5.580km to Ch.25.633km (Design Ch.0.000km to Ch.17.737km) for Package-1 of Bilasipura- Guwahati Road (NH-17) (Section: Near Chirakuta to Nea Read more about Independent Engineer services for supervision of Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch.5.580km to Ch.25.633km (Design Ch.0.000km to Ch.17.737km) for Package-1 of Bilasipura- Guwahati Road (NH-17) (Section: Near Chirakuta to Nea
Consultancy Services as Authority’s Engineer for Supervision of: i) Ukhrul bypass on NH-102A (Package-1, Length-6.571 km) ii) Finch Corner to Ukhrul section of NH-202 (Package-3, Length-14.63 km) & iii) Ukhrul to Choithar section of NH-202 (Package-4, Len Read more about Consultancy Services as Authority’s Engineer for Supervision of: i) Ukhrul bypass on NH-102A (Package-1, Length-6.571 km) ii) Finch Corner to Ukhrul section of NH-202 (Package-3, Length-14.63 km) & iii) Ukhrul to Choithar section of NH-202 (Package-4, Len
Independent Engineer services for supervision of Four laning of Silchar (near Nutan Dayapur village) – Budha Nagar Section under Package: SJ-1 of NH-37 from Existing km 260+000 (D. Ch.4+560) to Existing km 233+000 (D. Ch. 24+560) in the State of Assam und Read more about Independent Engineer services for supervision of Four laning of Silchar (near Nutan Dayapur village) – Budha Nagar Section under Package: SJ-1 of NH-37 from Existing km 260+000 (D. Ch.4+560) to Existing km 233+000 (D. Ch. 24+560) in the State of Assam und
CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION of:- (i) Construction of Intermediate Lane Road with Hard Shoulder from Design Ch. 0+000 to Ch. 17.387 (Total Design Length = 17.387 Km) of Hunli to Ithun Bridge Section of NH-913 (Frontier Hig Read more about CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION of:- (i) Construction of Intermediate Lane Road with Hard Shoulder from Design Ch. 0+000 to Ch. 17.387 (Total Design Length = 17.387 Km) of Hunli to Ithun Bridge Section of NH-913 (Frontier Hig
Consultancy services for Authority’s Engineer for Supervision of Widening/Improvement to 4 (Four) Lane with Paved Shoulder of Daboka – Khatkhati stretch of NH-29 of Package 5, starting from Near Ganpath Gaur Gaon at Km 95+400 to Kwaram Taro village at Km Read more about Consultancy services for Authority’s Engineer for Supervision of Widening/Improvement to 4 (Four) Lane with Paved Shoulder of Daboka – Khatkhati stretch of NH-29 of Package 5, starting from Near Ganpath Gaur Gaon at Km 95+400 to Kwaram Taro village at Km
Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch.5.580km to Ch.25.633km (Design Ch.0.000km to Ch.17.737km) for Package-1 of Bilasipura- Guwahati Road (NH-17) (Section: Near Chirakuta to Near Mowatari, before Chapar Bypass) in the state of Read more about Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch.5.580km to Ch.25.633km (Design Ch.0.000km to Ch.17.737km) for Package-1 of Bilasipura- Guwahati Road (NH-17) (Section: Near Chirakuta to Near Mowatari, before Chapar Bypass) in the state of
Construction of RCC Box Cell Viaduct by Cast in Situ method at chainage Km 153.150 to Km 153.350 and Km 155.850 to km 156.300 along with other ancillary works on NH-29 in the state of Nagaland under SARDP-NE through Engineering, Procurement and Constructi Read more about Construction of RCC Box Cell Viaduct by Cast in Situ method at chainage Km 153.150 to Km 153.350 and Km 155.850 to km 156.300 along with other ancillary works on NH-29 in the state of Nagaland under SARDP-NE through Engineering, Procurement and Constructi