Tender Evaluation Result 2021

Sr. No Title Year Document
101 Technical Evaluation Result for Construction of two lane with paved shoulders road from Tamenglong to Mahur (NH-137) in the State of Manipur from km 43.480 near Phelong Village to km 54.180 near Azuram Village (Length- 10.700 km) (Package-4) on EPC mode. 2021 Size: 957.53 KB
102 Technical Evaluation Result for Construction of two lane with paved shoulders road from Tameglong to Mahur (NH-137) in the State of Manipur from km 0.000 at Tamenglong to km 10.000 near Dialong (Length- 10.000 km) (Package-1) on EPC mode. (2nd Call). Date 2021 Size: 940.78 KB
103 Technical Evaluation Result for CONSTRUCTION OF FOOT TRACK FROM TUNGRI TO SAMCHUNG FROM KM 0.000 TO KM 29.546 IN EAST KAMENG IN THE STATE OF ARUNACHAL PRADESH ON ENGINEERING, PROCUREMENT AND CONSTRUCTION (THE “EPC”) MODE. Dated: 16-07-2021. 2021 Size: 4.29 MB
104 Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of: Widening/Improvement to 4 (Four) Lane with Paved Shoulder from KM 51+246to Km 66+000 (Design Chainage 50+710 to 65+923) of Parokhuwa – Dokmoka Section(Packag 2021 Size: 1.46 MB
105 Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of: Widening/Improvement to 4 (Four) Lane with Paved Shoulder from KM 51+246to Km 66+000 (Design Chainage 50+710 to 65+923) of Parokhuwa – Dokmoka Section(Packag 2021 Size: 1.82 MB
106 Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of: Widening/Improvement to 4 (Four) Lane with Paved Shoulder from KM 51+246to Km 66+000 (Design Chainage 50+710 to 65+923) of Parokhuwa – Dokmoka Section(Packag 2021 Size: 1.66 MB
107 Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of: Widening/Improvement to 4 (Four) Lane with Paved Shoulder from KM 51+246to Km 66+000 (Design Chainage 50+710 to 65+923) of Parokhuwa – Dokmoka Section(Packag 2021 Size: 3.05 MB
108 Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of: Widening/Improvement to 4 (Four) Lane with Paved Shoulder from KM 51+246to Km 66+000 (Design Chainage 50+710 to 65+923) of Parokhuwa – Dokmoka Section(Packag 2021 Size: 4.02 MB
109 Technical Evaluation Result for Widening to 2 (Two) Lane with Hard shoulder of Churachandpur to Tuivai section of NH 102B from Design Chainage 69+875 km to 121+769 Km (PKG-3) in the State of Manipur on Engineering, Procurement & Construction (EPC) mode. D 2021 Size: 2.02 MB
110 Technical Evaluation Result for Widening to 2 (Two) Lane with Hard shoulder of Churachandpur to Tuivai section of NH 102B from Design Chainage 69+875 km to 121+769 Km (PKG-3) in the State of Manipur on Engineering, Procurement & Construction (EPC) mode. D 2021 Size: 851.04 KB