Technical Evaluation Result for Strengthening of the Section from Km 40.300 to Km 42.000 of SilcharVaringte, NH-306 in FY 21-22: Second Call. Dated: 13-05-2021.
2021
Size: 149.34 KB
142
Technical Evaluation Result for Construction of Two Major bridges at Existing Ch. 23+650 (designed Ch. 23+550) and Ch. 28+200 (designed Ch. 28+200) of bridge span 160 m along the Existing Hunli-Anini Road from Km 21.500 to Km 37.500 in the State of Arun
2021
Size: 2.23 MB
143
Technical Evaluation Result for Vegetation Clearance, Drain Clearance with Pot Patch Repair Work including Protection works in Financial Year 2021 on NH10 (From KM 52 to KM 80) in the state of Sikkim on Percentage Contract Basis. Dated: 04-05-2021.
2021
Size: 560.33 KB
144
Technical Evaluation Result for Vegetation Clearance, Drain Clearance with Pot Patch Repair Work including Protection works in Financial Year 2021 on NH10 (From KM 52 to KM 80) in the state of Sikkim on Percentage Contract Basis. Dated: 04-05-2021.
2021
Size: 372.2 KB
145
Technical Evaluation Result for Notice Inviting Bid for Lease of Office Premises of NHIDCL, Project Monitoring Unit – Silchar (Assam). Dated: 17-04-2021.
2021
Size: 147.38 KB
146
Technical Evaluation Result for Maintenance & Repair work of Ranipool to Pakyong stretch from km 2.000 to km 6.000 at NH-717A in the state of Sikkim for FY 2021-22. Dated: 27-04-2021.
2021
Size: 353.87 KB
147
Technical Evaluation Result for Selection of Manpower Placement Agency for providing services of Outsourced manpower on monthly basis for NHIDCL at Regional Office- Port Blair, its PMUs and site offices in the Union Territory of Andaman & Nicobar Islands-
2021
Size: 493.65 KB
148
Technical Evaluation Result for Selection of Manpower Placement Agency for providing services of Outsourced manpower on monthly basis for NHIDCL at Regional Office- Port Blair, its PMUs and site offices in the Union Territory of Andaman & Nicobar Islands-
2021
Size: 755.66 KB
149
Technical Evaluation Result for Construction of 2 Laning with Hard Shoulder of Peren – Dimapur section on NH – 129A from Design Km 126.775 to Km 146.208 (Length – 19.433 Km) in the state of Nagaland on EPC mode (Pkg – II) under NH(O) – TSP. Dated: 16-04-2
2021
Size: 5.99 MB
150
Technical Evaluation Result for Notice Inviting Bid for Lease of Office Premises of NHIDCL, Project Monitoring Unit – Bongaigaon (Assam) – 3rd Call. Dated: 16-04-2021.