Tender Evaluation Result 2021

Sr. No Title Year Document
171 Revised Technical Evaluation Result-II for Rehabilitation and Up-gradation to 2 lane with paved shoulders of Dulte – Champhai road (International Corridor) of NH-6 from Design Chainage Km 72.350 to Km 84.800 (Package-II) in the State of Mizoram under B 2021 Size: 611.89 KB
172 Revised Technical Evaluation Result-II for Widening/Up-Gradation to 2 lane with Paved shoulder of NH-301 KargilZanskar Road from Design km 196.250 (Existing km 194.790) to Design km 230.020 (Existing km 231.692) in the UT of Ladakh on EPC mode (Package-VI 2021 Size: 620.87 KB
173 Revised Technical Evaluation Result for Widening/Up-Gradation to 2 lane with Paved shoulder of NH301 Kargil-Zanskar Road from Design km 57.000 (Existing km 57.905) to Design km 87.000 (Existing km 88.249) in the UT of Ladakh on EPC mode (Package-III). Dat 2021 Size: 604.61 KB
174 Revised Technical Evaluation Result for Widening/Up-Gradation to 2 lane with Paved shoulder of NH301 Kargil-Zanskar Road from Design km 30.040 (Existing km 30.000) to Design km 57.000 (Existing km 57.905) in the UT of Ladakh on EPC mode (Package-II). Date 2021 Size: 595.11 KB
175 Revised Technical Evaluation Result for Widening/Up-Gradation to 2 lane with Paved shoulder of NH301 Kargil-Zanskar Road from Design km 0.000 (Existing km 0.000) to Design km 30.040 (Existing km 30.000) in the UT of Ladakh on EPC mode (Package-I). Dated: 2021 Size: 541.96 KB
176 Revised Technical Evaluation Result for Construction of 2-laning with hard shoulder configuration of Chhumkhum to Tlabung from Design Chainage Km 37.420 to Km 74.950 [Pkg-B] for Lunglei-Tlabung section of NH-302 in the State of Mizoram under ‘Bharatmala P 2021 Size: 1.63 MB
177 Revised Technical Evaluation Result for Up-gradation to 2 lane with paved shoulders of Dulte – Champhai road  (International Corridor) of NH-6 from Design Chainage Km 84.800 to km  111.580 (Package-III) in the State of Mizoram under Bharatmala&n 2021 Size: 1.54 MB
178 Revised Technical Evaluation Result for Up-gradation to 2 lane with paved shoulders of Dulte – Champhai road  (International Corridor) of NH-6 from Design Chainage Km 84.800 to km  111.580 (Package-III) in the State of Mizoram under Bharatmala&n 2021 Size: 1.2 MB
179 Revised Technical Evaluation Result for Rehabilitation and Up-gradation to 2 lane with paved shoulders of Dulte  – Champhai road (International Corridor) of NH-6 from Design Chainage  Km 72.350 to Km 84.800 (Package-II) in the State of Mizoram u 2021 Size: 1.52 MB
180 Revised Technical Evaluation Result for Up-gradation to 2 lane with paved shoulders of Dulte – Champhai road  (International Corridor) of NH-6 from Design Chainage Km 54.400 to km  72.350 (Package-I) in the State of Mizoram under Bharatmala Pari 2021 Size: 1.54 MB