Tender Evaluation Result 2021

Sr. No Title Year Document
191 Technical Evaluation Result for Widening/Up-Gradation to 2 lane with Paved shoulder of NH301 Kargil-Zanskar Road from Design km 0.000 (Existing km 0.000) to Design km 30.040 (Existing km 30.000) in the UT of Ladakh on EPC mode (Package-I). Dated: 24-03-20 2021 Size: 792.06 KB
192 Technical Evaluation Result for Widening/Up-Gradation to 2 lane with Paved shoulder of NH-301 KargilZanskar Road from Design km 196.250 (Existing km 194.790) to Design km 230.020 (Existing km 231.692) in the UT of Ladakh on EPC mode (Package-VIII). Dated: 2021 Size: 762.35 KB
193 Technical Evaluation Result for Widening/Up-Gradation to 2 lane with Paved shoulder of NH301 Kargil-Zanskar Road from Design km 57.000 (Existing km 57.905) to Design km 87.000 (Existing km 88.249) in the UT of Ladakh on EPC mode (Package-III). Dated: 24-0 2021 Size: 780.63 KB
194 Technical Evaluation Result for Widening/Up-Gradation to 2 lane with Paved shoulder of NH301 Kargil-Zanskar Road from Design km 30.040 (Existing km 30.000) to Design km 57.000 (Existing km 57.905) in the UT of Ladakh on EPC mode (Package-II). Dated: 24-03 2021 Size: 749.77 KB
195 Technical Evaluation Result for Construction of Two-Lane with hard shoulders of Merangkong Tamlu Mon road (Wakching Town portion) on EPC basis from existing Km 59+000 to Km 73+640 [Design Km. 59+000 to Km. 72+450] (Design Length – 13.450 Km)(Package V) in 2021 Size: 4.39 MB
196 Technical Evaluation Result for Up-gradation to 2 lane with paved shoulders of Dulte – Champhai road (International Corridor) of NH-6 from Design Chainage Km 54.400 to km 72.350 (Package-I) in the State of Mizoram under Bharatmala Pariyojna on EPC mode. D 2021 Size: 2.98 MB
197 Technical Evaluation Result for Rehabilitation and Up-gradation to 2 lane with paved shoulders of Dulte – Champhai road (International Corridor) of NH-6 from Design Chainage Km 72.350 to Km 84.800 (Package-II) in the State of Mizoram under Bharatmala Pari 2021 Size: 2.73 MB
198 Technical Evaluation Result for Construction of New 2-Lane bypass from Design km 176+532(Existing km 263+070) (Donipawa) on NH-244 to Design Km 185+002 (Near Khudwani on NH-44 at existing km 238+500)(Alstop) Via Ashajipora of 8.470km length i.e. to connec 2021 Size: 2.94 MB
199 Technical Evaluation Result for Strengthening of entrusted section of NH 208 from (Kalyanpur) to (Khowai Chowmuhuni, Teliamura) (Km. 124.000 to Km. 139.600) [Total Length 15.600 Km.] in the State of Tripura in the FY 2021-22. Dated: 24-03-2021. 2021 Size: 302.76 KB
200 Technical Evaluation Result for Improvement and Widening to two lane with paved shoulder of Manu – Simlung section of NH-44A starting near Vaghmun at km 66.845 and ending near Simlung at km 85.125(Length-18.28km) in the state of Tripura on Engineering, Pr 2021 Size: 404.69 KB