Tender Evaluation Result 2021

Sr. No Title Year Document
211 Technical Evaluation Result for Shifting of 33KV, 11 KV and LT line on Jammu-Akhnoor section of NH-144 A in the UT of Jammu & Kashmir. Dated: 16-03-2021. 2021 Size: 2.68 MB
212 Technical Evaluation Result for Construction & Upgradation to 2 lane with paved shoulder from Design Km. 51.700 (Prem Nagar) to Km 66.535 (New Thathri) of 14.84 Km length on Khellani – Kishtwar –Chattroo section of NH-244 in the Union Territory of Jammu & 2021 Size: 611.26 KB
213 Technical Evaluation Result for Selection of Manpower Placement Agency for providing services of Outsourced manpower on monthly basis for NHIDCL at Regional Office- Port Blair, its PMUs and site offices in the Union Territory of Andaman & Nicobar Islands- 2021 Size: 818.55 KB
214 Technical Evaluation Result for Detailed survey of NH-4 from Km 0.00 to Km 330.7 using Network Survey Vehicle (NSV) in the Union Territory of Andaman & Nicobar Islands- 3rd Call. Dated: 12-03-2021. 2021 Size: 685.65 KB
215 Technical Evaluation Result for Construction of various RCC infrastructure works for Ladakh Police in the Union Territory of Ladakh. Dated: 12-03-2021. 2021 Size: 226.67 KB
216 Technical Evaluation Result for Construction of 2 Laning with Hard Shoulder of Peren – Dimapur section on NH – 129A from Design Km 163.592 to Km 173.850 (Length – 10.258 Km) in the state of Nagaland on EPC mode (Pkg – IV) under NH (O) – TSP. Dated: 11-03- 2021 Size: 2.2 MB
217 Technical Evaluation Result for CONSTRUCTION OF HIGH ALTITUDE HILL ROAD FROM TAKSING TO GHORA FROM KM 0.000 TO KM 7.090 IN UPPER SUBANSIRI DISTRICT OF THE STATE OF ARUNACHAL PRADESH ON EPC MODE. Dated: 09-03-2021. 2021 Size: 6.76 MB
218 Technical Evaluation Result for Reconstruction of 94 Nos. of culverts in the stretch from Km 298.00 to km 330.662 (Karala to Kalipur) of NH-04 in the Union Territory of Andaman & Nicobar Islands on EPC Mode. Dated: 05-03-2021. 2021 Size: 299.45 KB
219 Technical Evaluation Result for Construction and upgradation of existing road to 2-lane with paved shoulder from Km 37+600 (New Rolep bridge) to Km 52+000 (Chochenpheri) of Rhenok-Menla spur (NH717B) Package-IIC on EPC basis under SARDP-NE Phase ‘A’ in th 2021 Size: 403.81 KB
220 Technical Evaluation Result for Construction and upgradation of existing road to 2-lane with paved shoulder from Km 37+600 (New Rolep bridge) to Km 52+000 (Chochenpheri) of Rhenok-Menla spur (NH717B) Package-IIC on EPC basis under SARDP-NE Phase ‘A’ in th 2021 Size: 356.42 KB