Tender Evaluation Result 2023

Sr. No Title Year Document
21 Technical Evaluation of Consultancy Services for Authority’s Engineer For Supervision of the following projects: i. Widening/Improvement to 2 (Two) lane with earthen shoulder of Choithar to Marrem Khullen section of NH-202 of Imphal- Ukhrul-Jessami Econom 2023 Size: 378.36 KB
22 Technical Evaluation Result for CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF: i) Four laning of Silchar – Dhanehari section (Package-1) from Existing Chainage km 263+800 of NH 37 to km 12+920 of NH 306 (Design Chainage km 0+000 to km 2 2023 Size: 378.36 KB
23 Technical Evaluation Result of the Consultancy Services for Authority Engineer for Supervision of: i. Widening/Improvement of NH-515 to 4 (Four) Lane with Paved Shoulder from km 0+800 (Kandulijan Gaon) to km 27+701 (Simen Chapori) on NH-515 in the State o 2023 Size: 586.94 KB
24 Technical Evaluation Result of the Consultancy Services for Authority Engineer for Supervision of: i. Widening/Improvement to 4 (Four) Lane with Paved Shoulder from km 626+030 (Nalani hulla Gaon) to km 650+450 (Chotahapjan) on existing Tinsukia-Makum Bypa 2023 Size: 669.06 KB
25 Technical Evaluation Result for Consultancy Services as Authority’s Engineer for Supervision of: (i) Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch. 143+680 km to Ch. 177.372 Km (Design Ch. 139.750km to Ch. 173.434km) for Package-9 of B 2023 Size: 414.72 KB
26 Technical Evaluation Result for Construction of Balance Work of the 4-laning of the Section from Jorhat to Jhanji of NH-37 (Old): Pkg-I: Road Works from Km 453+000 to Km 463+000 (10.000 Km), under SARDP-NE, under EPC Mode 2023 Size: 361.52 KB
27 Technical Evaluation Result for Construction of Balance Work of the 4-laning of the Section from Jorhat to Jhanji of NH-37 (Old): Pkg-III: Road Works from Km 477.000 to Km 490+800 (13.800 Km), under SARDP-NE, under EPC Mode 2023 Size: 370.73 KB
28 Technical Evaluation Result for Construction of Balance Work of the 4-laning of the Section from Jorhat to Jhanji of NH-37 (Old): Pkg-IV: Structures & Toll Plaza, under SARDP-NE, under EPC Mode 2023 Size: 359.94 KB
29 Technical Evaluation result for Construction of Balance Work of the 4-laning of the Section from Jorhat to Jhanji of NH-37 (Old): Pkg-II: Road Works from Km 463 to Km 477 (14.000 Km), under SARDP-NE, under EPC Mode. 2023 Size: 385.97 KB
30 Technical Evaluation Result of the Consultancy Services for Authority Engineer for Supervision of: i. Widening/Improvement of NH-515 to 4 (Four) Lane with Paved Shoulder from km 0+800 (Kandulijan Gaon) to km 27+701 (Simen Chapori) on NH-515 in the State o 2023 Size: 571.73 KB