Technical Evaluation Result for Construction of Four Lane Panchgram Bypass from Design Chainage km 15+500 on NH-37 (Old NH-53) at Kalinagar Pt.-II Village to Design Chainage km 27+300 at crossing with NH-6 (Old NH-44) Near Siddeswar Pt.-I Village in the S
2023
Size: 422.69 KB
32
Technical Evaluation Result for Consultancy Services for Authority’s Engineer for supervision of: (i) Construction of Four Lane Panchgram Bypass from Design Chainage km 15+500 on NH-37 (Old NH-53) at Kalinagar Pt.-II Village to Design Chainage km 27+300 a
2023
Size: 412.16 KB
33
Technical Evaluation Result for Consultancy Services as Authority’s Engineer for Supervision of: i) Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch. 143+680 km to Ch. 177.372 Km (Design Ch. 139.750km to Ch. 173.434km) for Package-9 of Bi
2023
Size: 334.31 KB
34
Technical Evaluation Result for Consultancy Services as Authority’s Engineer for Supervision of: i) Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch. 143+680 km to Ch. 177.372 Km (Design Ch. 139.750km to Ch. 173.434km) for Package-9 of Bi
2023
Size: 647.33 KB
35
Technical Evaluation Result for Consultancy Services as Authority’s Engineer for Supervision of: i) Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch. 143+680 km to Ch. 177.372 Km (Design Ch. 139.750km to Ch. 173.434km) for Package-9 of Bi
2023
Size: 567.28 KB
36
Technical Evaluation Result of Consultancy Services as Authority’s Engineer for Supervision of Construction of Uni-directional Sudhmahadev – Dranga Twin Tube Tunnel and its approach roads (from D.Ch. 0.00 to D Ch. 12.85) on Chenani – Sudhmahadev – Goha Ro
2023
Size: 369.9 KB
37
Technical Evaluation Result for Consultancy Services for preparation of Detailed Project Report and for pre-construction activities towards Construction of 4-lane Tunnel Connectivity across river Brahmaputra between Gohpur (on NH-15) and Numaligarh (on NH
2023
Size: 307.48 KB
38
Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report and providing Pre-construction activities for connecting National Waterway – 2 at Dhubri to NH- 127B in the State of Assam. – (3rd Call)
2023
Size: 307.48 KB
39
Technical Evaluation Result for Consultancy Services as Authority’s Engineer for Supervision of Construction of Uni Directional Singhpora-Vailoo Tunnel (Under Sinthan pass) and its approach road (of 2-lane with paved shoulder) on Sudhmahdev Goha-Khellani-
2023
Size: 574.64 KB
40
Technical Evaluation Result for Improvement/Widening to 2-lane with paved shoulder/4-lanning of NH-40 between Shillong to Dawki road upto Bangladesh Border including Dawki Bridge from (Design km 10+670 to km 37+550) design length of 26.550 km in the State