Technical Evaluation Result for CONSTRUCTION OF BALANCE WORK OF TWO – LANE WITH HARD SHOULDERS OF EXISTING HAYULIANG – HAWAI ROAD (NH-113) FROM DESIGN KM 51.825 TO KM 63.131 (EXISTING KM 45.050 OF HAYULIANG – HAWAI ROAD TO HAWAI TOWN)(11.306 KM) ON EPC BA
2021
Size: 308.69 KB
242
Technical Evaluation Result for CONSTRUCTION OF BALANCE WORK OF 2 LANING OF AKAJAN-LIKABALI-BAME ROAD ON EPC BASIS FROM DESIGN KM 33.00 TO KM 65.810 (EXISTING KM 36.00 TO KM 71.00) IN THE STATE OF ARUNACHAL PRADESH UNDER SARDP-NE). Dated: 29-01-2021.
2021
Size: 5.63 MB
243
Technical Evaluation Result for Construction & Upgradation to 2 lane with paved shoulder from Design Km. 31.449 (Khellani) (Ex. Km 44.946) to Km 51.700 (Prem Nagar) (Ex. Km 68+617) of 20.251 Km length on Khellani – Kishtwar – Chattroo section of NH-244 in
2021
Size: 1.37 MB
244
Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from km 81+000 to km 95+400 (Design Chainage 80+930 to 96+400) of Loring Thepi – Ganapath Gaur Gaon Section – (Package-4) of NH-29 in the state of Assam under Bharat
2021
Size: 4.73 MB
245
Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of“Construction and Upgradation of existing road on NH-510 between Rabangla to Gyalshing to 2-lane with paved shoulder configuration in the State of Sikkim under
2021
Size: 349.05 KB
246
Technical Evaluation Result for Procurement of Ambulances- Fully equipped Ambulances for Highway patrolling under the jurisdiction of NHIDCL’s Regional Offices located in NER States, UT of Ladakh, J&K, A&N Islands and Uttarakhand. Dated: 11-01-2021.
2021
Size: 339.98 KB
247
Technical Evaluation Result for CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF (i) WIDENING/IMPROVEMENT TO 4 (FOUR) LANE WITH PAVED SHOULDER FROM KM 66+000 TO KM 81+000 (DESIGN CHAINAGE 65+923 TO 80+930) OF DOKMOKA – LORINGTHEPI SECTION
2021
Size: 5.33 MB
248
Technical Evaluation Result for Construction of High Altitude Hill road from Ladda to Basai from KM 0.000 to KM 32.260 in East Kameng District of the state of Arunachal Pradesh on EPC Mode. Dated: 08-01-2021.
2021
Size: 3.85 MB
249
Technical Evaluation Result for Construction of 2 Laning with Hard Shoulder of Peren – Dimapur section on NH – 129A from Design Km 126.775 to Km 146.450 (Length – 19.675 Km) in the state of Nagaland on EPC mode (Pkg – II) under Bharatmala NH(O) – TSP . Da
2021
Size: 7.64 MB
250
Technical Evaluation Result for Consultancy Services for supervision of “Special repair of NH 202, Mokokchung-Tuensang Road (from Km 0.000 to 95.000 Km) [Total length – 95.00 Km] in the state of Nagaland for the FY 2020-21-3rd Call. Dated: 07-01-2021.