Technical Evaluation Result for Construction of 2 Laning with Hard Shoulder of Peren – Dimapur section on NH – 129A from Design Km 173.850 to Km 190.850 (Length – 17.00 Km) in the state of Nagaland on EPC mode (Pkg – V) under NH(O) – TSP. Dated: 02-02-202
2021
Size: 3.3 MB
232
Technical Evaluation Result for Construction of 2 Laning with Hard Shoulder of Peren – Dimapur section on NH – 129A from Design Km 146.208 to Km 163.592 (Length – 17.384 Km) in the state of Nagaland on EPC mode (Pkg – III) under NH(O) – TSP. Dated: 02-02-
2021
Size: 4.18 MB
233
Technical Evaluation Result for Realignment of NH717A from Design CH: 0.00 (Km 77.800 of NH-10) to Design CH: 2.00 (Km 3.100 of NH-717A) with two lane paved shoulder including Major Bridge of 680 m in the State of Sikkim on EPC Mode. Dated: 02-02-2021.
2021
Size: 335.91 KB
234
Technical Evaluation Result for Rehabilitation and up-gradation of road from design km 19.300 to km 31.300 (Total length: 12.000 km) of Agartala – Khowai section on NH 108 B to two lane with paved shoulder in the state of Tripura on EPC basis (Package-II)
2021
Size: 422 KB
235
Technical Evaluation Result for Construction & Upgradation to 2-lane /4lane with paved shoulder from Design Km 148+589 (Existing km 235+070) (Vailoo )to Design Km 176+532 (Existing km 263+070) Donipawa of 27.943 km length on Khellani-Khanabal section of N
2021
Size: 506.58 KB
236
Technical Evaluation Result for Ordinary Repair of Ukhrul-Toloi-Tadubi road from km 00.000 to km 60.000 covering 60.00 Km length on NH-102A in the state of Manipur on Item Rate Basis. Dated: 01-02-2021.
2021
Size: 291.2 KB
237
Technical Evaluation Result for Ordinary Repair of Ukhrul-Toloi-Tadubi road from km 60.000 to km 115.000 covering length of 55.00 Km on NH-102A in the state of Manipur on Item Rate Basis. Dated: 01-02-2021.
2021
Size: 295.46 KB
238
Technical Evaluation Result for Rehabilitation of section from Km 298.00 to Km 330.662 (Karala to Kalipur) of NH-04 to Intermediate lane with hard shoulder in the Union Territory of Andaman & Nicobar Islands (Total Length 32.662 km) on EPC Mode (Package-
2021
Size: 337 KB
239
Technical Evaluation Result for CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF: (i) Construction of two lane with hard shoulders of Arrowa-Khupa-Hayuliang Section of NH-113 from Ch 68.550 Km to 91.633 in the state of Arunachal Pradesh on
2021
Size: 2.68 MB
240
Technical Evaluation Result for Consultancy Services for Authority’s Engineer for Supervision of (i)“Construction of 2 laning with Hard shoulder of Peren- Dimapur section on NH 129A from Design Km 109.494 to Km 126.775 (Length – 17.281 Km) in the state of