post photo test testing only Tags NHIDCL Admin Module Digital Office Read more about post photo test 1 commentAdd new comment
Construction of left-over work (2-lane with paved shoulder) of the road stretch of Pkg-III at Kandni Village from design Ch. 0+000 to Ch. 4+037 (Ch. 70+900 to Ch. 74+650 of NH-244) in 4.037 km length on Khellani-Kishtwar-Chhatroo section of NH-244 in UT o Read more about Construction of left-over work (2-lane with paved shoulder) of the road stretch of Pkg-III at Kandni Village from design Ch. 0+000 to Ch. 4+037 (Ch. 70+900 to Ch. 74+650 of NH-244) in 4.037 km length on Khellani-Kishtwar-Chhatroo section of NH-244 in UT o
Construction of Intermediate Lane of Pango to Jorging Road from Design Km 40+000 to Design Km 82+060 section of frontier Highway (NH-913) (Design Length: 42.06 Km, Package-II, Greenfield Alignment) in the State of Arunachal Pradesh on EPC mode. Read more about Construction of Intermediate Lane of Pango to Jorging Road from Design Km 40+000 to Design Km 82+060 section of frontier Highway (NH-913) (Design Length: 42.06 Km, Package-II, Greenfield Alignment) in the State of Arunachal Pradesh on EPC mode.
Consultancy Services as Authority’s Engineer for Supervision of: (i) Construction of two lane with paved shoulders road from Tamenglong to Mahur (NH-137) in the State of Manipur starting from km 54.180 near Azuram to km 80.630 near Mandeu (Package-5) on E Read more about Consultancy Services as Authority’s Engineer for Supervision of: (i) Construction of two lane with paved shoulders road from Tamenglong to Mahur (NH-137) in the State of Manipur starting from km 54.180 near Azuram to km 80.630 near Mandeu (Package-5) on E
Consultancy services for Authority’s Engineer for Supervision of: (i) 4-Laning of NH-37 from Nagaon By-pass to Teliagaon (km 278.600 to km 288.600) in the state of Assam under SARDP-NE Phase-A on EPC mode. (ii) 4-Laning of NH-37 from Teliagaon to Rangagar Read more about Consultancy services for Authority’s Engineer for Supervision of: (i) 4-Laning of NH-37 from Nagaon By-pass to Teliagaon (km 278.600 to km 288.600) in the state of Assam under SARDP-NE Phase-A on EPC mode. (ii) 4-Laning of NH-37 from Teliagaon to Rangagar
Consultancy services for Authority’s Engineer for Supervision of: (i) 4-Laning of NH-37 from Nagaon By-pass to Teliagaon (km 278.600 to km 288.600) in the state of Assam under SARDP-NE Phase-A on EPC mode. (ii) 4-Laning of NH-37 from Teliagaon to Rangagar Read more about Consultancy services for Authority’s Engineer for Supervision of: (i) 4-Laning of NH-37 from Nagaon By-pass to Teliagaon (km 278.600 to km 288.600) in the state of Assam under SARDP-NE Phase-A on EPC mode. (ii) 4-Laning of NH-37 from Teliagaon to Rangagar
Consultancy services for Authority’s Engineer for Supervision of: (i) 4-Laning of NH-37 from Nagaon By-pass to Teliagaon (km 278.600 to km 288.600) in the state of Assam under SARDP-NE Phase-A on EPC mode. (ii) 4-Laning of NH-37 from Teliagaon to Rangag Read more about Consultancy services for Authority’s Engineer for Supervision of: (i) 4-Laning of NH-37 from Nagaon By-pass to Teliagaon (km 278.600 to km 288.600) in the state of Assam under SARDP-NE Phase-A on EPC mode. (ii) 4-Laning of NH-37 from Teliagaon to Rangag