Tender Evaluation Result 2018

Sr. No Title Year Document
21 Technical Evaluation result for Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for up gradation of new National Highways (Guwahati-Jorabat bypass) in the state of Assam. Dated: 22 2018 Size: 347.03 KB
22 Technical Evaluation Result of Consultancy Services for Authority’s Engineer for Supervision of Construction, Operation and Maintenance of 2-lane Bi-Directional Silkyara Bend –Barkot Tunnel with escape passage including approaches on Dharasu- Yamunotri se 2018 Size: 4.46 MB
23 Technical Result For Clearance of landslides in soil, ordinary rock and hard rock from Km 80.000 to 123.600 on Batote-Kishtwar – Sinthanpass road section of NH-244 in the State of Jammu & Kashmir (as and when required basis). Dated : 01-10-2018 2018 Size: 1.75 MB
24 Technical Result For Clearance of landslides in soil, ordinary rock and hard rock from Km 25.000 to 80.000 on Batote-Kishtwar – Sinthanpass road section of NH-244 in the State of Jammu & Kashmir (as and when required basis). Dated : 01-10-2018 2018 Size: 1.9 MB
25 Technical Result For Clearance of landslides in soil, ordinary rock and hard rock from Km 123.600 to 170.000 on Batote-Kishtwar – Sinthanpass road section of NH-244 in the State of Jammu & Kashmir (as and when required basis). Dated : 01-10-2018 2018 Size: 1.78 MB
26 Technical Result For Clearance of landslides in soil, ordinary rock and hard rock from Km 0.000 to 25.000 on Batote-Kishtwar – Sinthanpass road section of NH-244 in the State of Jammu & Kashmir (as and when required basis). Dated : 01-10-2018 2018 Size: 1.81 MB
27 Opening of Financial Bids for the Project of Consultancy Services for Authority’s Engineer for Supervision of “Two- lane with hard shoulders of Pfutsero-Phek Road from: (i) Design Km 0.000 to Km 20.000 (Existing Km 0.000 to Km 19.900) (ii) Design Km 20.0 2018 Size: 1.84 MB
28 Technical Result for the Project of Consultancy Services for Authority’s Engineer for Supervision of Construction, Operation and Maintenance of 2-lane Bi-Directional Silkyara Bend –Barkot Tunnel with escape passage including approaches on Dharasu- Yamuno 2018 Size: 18.08 MB
29 Technical Score For The Project of Consultancy Services for Authority’s Engineer for – (i) Construction and Upgradation of existing road to 2-lane with paved shoulder from Km. 368.000 to Km. 399.000 of Lameri to Karanprayag (Excluding Km. 379.100 to Km 38 2018 Size: 15.36 MB
30 Technical Score For The Project of Consultancy Services for Authority’s Engineer for Supervision of “Two- lane with hard shoulders of Pfutsero-Phek Road from: (i) Design Km 0.000 to Km 20.000 (Existing Km 0.000 to Km 19.900) (ii) Design Km 20.000 to Km 4 2018 Size: 12.6 MB