Technical Evaluation Result for Improvement/ Widening to 2-lane with paved shoulder/4-laning of NH-40 between Shillong to Dawki road upto Bangladesh Border including Dawki bridge from km 131+820 to km 151+330 (design km 45+760 to km 63+530) Design length
2023
Size: 345.63 KB
2
Technical Evaluation Result for Widening & Upgradation to two lanes with paved shoulders road from Tamenglong to Mahur (NH-137) in the State of Assam starting near Jiri River (Assam/Manipur Border) at km 96.870 and ending near Hangrum at km 116.550 (Packa
2023
Size: 597.51 KB
3
Technical Evaluation Result for Construction of Two laning with Hard shoulder road of Ram- Mandir to Arrowa section of NH-113 from Design Km 0.000 to Km 2.910 (Existing Km 65.080 to Km 67.990) of total length 2.755 km excluding Tidding Bridge (155 m) in t
2023
Size: 540.12 KB
4
Technical Evaluation Result for Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for “Construction of Twin Tube Uni-directional Tunnel (10.8 km) under Ganesh top hill including appr
2023
Size: 342.65 KB
5
Technical Evaluation Result for Detailed Project Report for Construction of ‘Tungri-Mathow-Dubbin-Dishing-Debrik’ Road Approved under ICBR (PH-III) Project in the State of Arunachal Pradesh (Total length: 84.00 Km) ( Package-I)
2023
Size: 555.32 KB
6
Technical Evaluation Result for Improvement/ Widening to 2-lane with paved shoulder/4-laning of NH-40 between Shillong to Dawki road upto Bangladesh Border including Dawki bridge from km 131+820 to km 151+330 (design km 45+760 to km 63+530) Design length
2023
Size: 502.3 KB
7
Technical Evaluation Result for Consultancy Services as Authority’s Engineer for Supervision of “Construction of Uni-directional Sudhmahadev – Dranga Twin Tube Tunnel and its approach roads (from D.Ch. 0.00 to D Ch. 12.85) on Chenani – Sudhmahadev – Goha
2023
Size: 502.3 KB
8
Technical Evaluation Result for Consultancy Services as Authority’s Engineer for Supervision of Construction of UniDirectional Singhpora-Vailoo Tunnel (Under Sinthan pass) and its approach road (of 2-lane with paved shoulder) on Sudhmahdev Goha-Khellani-K
2023
Size: 464.21 KB
9
Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report for Construction of ‘Tuting-(Kunging) Kahebingo-Taphuk, Jorging–DBGG-2590 & DBGG – Nape,’ Road Approved under ICBR (PH-III)Project in the State of Arunachal Pr
2023
Size: 561.21 KB
10
Technical Evaluation Result for Widening & Upgradation to two lanes with paved shoulders road from Tamenglong to Mahur (NH-137) in the State of Assam starting near Jiri River (Assam/Manipur Border) at km 96.870 and ending near Hangrum at km 116.550 (Packa