Technical Evaluation Result for Consultancy Services for preparation of Detailed Project Report (DPR) for stretches Kamenbari to Tenga (Length = 60 Km) in the State of Arunachal Pradesh on fixed cost cum quality basis (Package-I)
2023
Size: 465.42 KB
52
Technical Evaluation Result for Construction of two lane with paved shoulder of Kohima-Bypass Road connecting NH-39 (New NH-02), NH-150 (New NH-02), NH-61 (New NH-29) And NH-39 (New NH-02) From Design Km 0.00 To Design Km 10.500 [Design Length-10.500 km]
2023
Size: 508.76 KB
53
Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report for 2 laning of Lunglei Bypass on western side of Lunglei town in the State of Mizoram
2023
Size: 620.11 KB
54
Technical Evaluation Results for Balance Work for Construction of Two lane with hard shoulder of Kohima-Jessami Road on NH-29 (Old NH-150) from existing Km 30.474(Near Kidwema road Chakahabama) to existing Km 53.220 (Near Kikruma village) [Design km 29.6
2023
Size: 313.81 KB
55
Technical Evaluation Result for Consultancy services for Authority’s Engineer for the following projects: i) Widening & Upgradation to two lanes with paved shoulders road from Tamenglong to Mahur (NH-137) in ii) the State of Assam starting from km 136.500
2023
Size: 400.89 KB
56
Technical Evaluation Result for Consultancy services as Authority’s Engineer for Supervision of Construction of four lane with paved shoulder Agartala bypass (Western side, length 25.402 km) connecting NH-8 (near Amtali) to NH-108B (near Lembuchhera) in t
2023
Size: 535.89 KB
57
Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report and providing services for pre-construction activities in respect of “Widening and Up-gradation of existing carriageway into 2-lane with paved shoulder configu
2023
Size: 700.33 KB
58
RFP for Consultancy Services as Authority’s Engineer for Supervision of: (i) Widening to 2 (Two) Lane with Hard shoulder of Akegwo-Avangkhu section of NH-202K for Package- I (Design Chainage 0+000 Km to 34+795 Km) in the State of Nagaland on EPC mode unde
2023
Size: 633.06 KB
59
RFP for Construction and Installation of prefabricated Office cum Residence in the States of Arunachal Pradesh, Sikkim, Uttarakhand, Himachal Pradesh & UT of Ladakh in high altitude remote areas on lumpsum mode
2023
Size: 208.79 KB
60
Technical Evaluation Result for Consultancy services for authority’s engineer for supervision of: (i) Four laning of Silchar – Dhanehari section (Package-1) from Existing Chainage km 263+800 of NH 37 to km 12+920 of NH 306 (Design Chainage km 0+000 to km