Tender Evaluation Result 2023

Sr. No Title Year Document
81 Technical Evaluation Result for Appointment of a Creative Agency for providing a creative/communication strategy and creative designs etc to the Ministry of Road Transport & Highways and its allied agencies. Dated : 18-05-2023. 2023 Size: 298.39 KB
82 Technical Evaluation Result for Empanelment of Aviation Agency for hiring of fixed and rotary wing aircraft. Dated : 11-05-2023. 2023 Size: 285.81 KB
83 Technical Evaluation Result for Construction of Four Lane Panchgram Bypass from Design Chainage km 15+500 on NH-37 (Old NH-53) at Kalinagar Pt.-II Village to Design Chainage km 27+300 at crossing with NH-6 (Old NH-44) Near Siddeswar Pt.-I Village in the S 2023 Size: 428.06 KB
84 Technical Evaluation Result for Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for “2-lane with Paved Shoulder of NHconfiguration for Baramulla-Gulmarg Road (approx length 42 Km)” 2023 Size: 309.5 KB
85 Technical Evaluation Result for Balance work for 2 Laning with Hard Shoulder of Peren – Dimapur section on NH – 129A from Design Km 126.775 to Km 146.208 (Length – 19.433 Km) in the state of Nagaland on EPC mode (Pkg – II) under NH(O) – TSP. Dated : 04-05 2023 Size: 282.22 KB
86 Technical Evaluation Result for Consultancy Services as Authority’s Engineer for Supervision of “2- laning of Zorinpui – Longmasu section of NH-502A from km 0.000 to km 28.244 in the State of Mizoram on EPC mode. Dated : 02-05-2023. 2023 Size: 634.44 KB
87 Technical Evaluation Result for Consultancy Services as Authority’s Engineer for Supervision of: Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch. 99+930km to Ch.143+680 km (Design Ch.96+000km to Ch.139+750km) for Package-8 of BilasipuraG 2023 Size: 511.87 KB
88 Technical Evaluation Result for Consultancy Services for preparation of Detailed Project Report (DPR) for stretches (i) Seijosa to Pakke kessang (ii) Seppa to Chayangtajo (iii) Kamenbari to Tenga (iv) Jang to Lumla and (v) Lumla to Neliya (border) in the 2023 Size: 918.54 KB
89 Technical Evaluation Result for Installation of Fencing of length 6.6 km (both sides) under Flyover in Jammu-Akhnoor Road section of NH-144A in the UT of Jammu & Kashmir in the FY 2022-23. Dated : 13-04-2023. 2023 Size: 789.52 KB
90 Technical Evaluation Result for Widening/Improvement to 2 (Two) lane with earthen shoulder of Marrem Khullen to Jessami section of NH-202 of Imphal – Ukhrul – Jessami Economic Corridor from Design Chainage km 95.700 to km 140.180 (Package-6) in the State 2023 Size: 463.03 KB