Technical Evaluation Result for Improvement/Widening to 2-lane with paved shoulder/4-lanning of NH-40 between Shillong to Dawki road upto Bangladesh Border including Dawki Bridge from (Design km 63+530 to km 71+520) design length of 7.99 km in the State o
2023
Size: 395.38 KB
72
Technical Evaluation Result for Balance work of 4-laning of Dimapur -Kohima Road from design Km 152.490 to Km 166.700 (Existing Km 156.000 to 172.900) excluding Dimapur & Kohima Bypass, in the state of Nagaland under SARDP-NE through an Engineering, Procu
2023
73
Technical Evaluation Result for Balance work of Construction of two-lane with hard Shoulders of Merangkong-Tamlu-Mon road (Wakching- Town Portion) on EPC basis from existing Km 59+000 to Km 73+640 [Design Km 59+000 to Km 72+450] (Design Length-13.450 Km)
2023
Size: 290.42 KB
74
Technical Evaluation Result for Package-I – Improvement to 2 lane with paved shoulder/ 4 lane of NH-40 section from Km 81+740 to Km 93+490 (design Km 0+000 to Km 10+670) & Improvement to 4 lane section of NH-44 from design Km 0+000 to Km 0+930, total leng
2023
Size: 649.36 KB
75
Technical Evaluation Result for Consultancy Services as Authority’s Engineer for Supervision of: (i) Widening to 2 (Two) Lane with Hard shoulder of Akegwo-Avangkhu section of NH-202K for Package- I (Design Chainage 0+000 Km to 34+795 Km) in the State of N
2023
76
Technical Evaluation Result for Balance work for Construction of 2 Laning with Hard Shoulder of Merangkong- Tamlu-Mon Road on EPC basis from existing Km 20.456 to Km 41.065 (Design Km. 20.000 to 40.000) (Design Length-20.000 Km) in the state of Nagaland
2023
Size: 338.58 KB
77
Technical Evaluation Result for Balance Work of Construction of Two-Lane with hard shoulders of Merangkong Tamlu Mon road on EPC basis from existing Km 76+640 to Km 98+065 [Design Km.63+800 to Km.86+835] (Design Length–23.035 Km) (Package IV) in the state
2023
Size: 353.56 KB
78
Technical Evaluation Result for Consultancy Services as Authority’s Engineer for Supervision of: Widening/Improvement to 4 (Four) Lane with Paved Shoulder from KM 38+500 to Km 51+246 (Design Chainage 38+500 to 50+959) with proposed Daboka Bypass of Daboka
2023
Size: 347.94 KB
79
Technical Evaluation Result for PERIODIC RENEWALS OF NH-4 FROM KM 59.400 TO KM 107.000 (JARAWA-I) IN THE UNION TERRITORY OF ANDAMAN AND NICOBAR ISLAND ON ITEM RATE BASIS IN THE FY 2023-24. Dated : 30-05-2023.
2023
Size: 1.15 MB
80
Technical Evaluation Result for Maintenance Work of (i) from Km 96.254 Rishi Border to Km 101.554 (Rhenock Charpatak) of NH-717A, & (ii) from Km 0.000 (Rhenock Charpatak) to Km 15.300 (Rongli Bazaar) of NH-717B total length of 20.600 Km in the state of Si