Tender Evaluation Result 2023

Sr. No Title Year Document
11 Technical Evaluation Result for Consultancy services for Authority’s Engineer for Supervision of following greenfield projects: (i) Construction of 2/4 Lane with paved shoulder of Shillong Western Bypass starting From near Ladumsaw (Existing km 60.900 of 2023 Size: 1.11 MB
12 Technical Evaluation Result for Construction of Two laning with Hard shoulder road of Ram- Mandir to Arrowa section of NH-113 from Design Km 0.000 to Km 2.910 (Existing Km 65.080 to Km 67.990) of total length 2.755 km excluding Tidding Bridge (155 m) in t 2023 Size: 415.02 KB
13 Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report for Construction of ‘Tuting-(Kunging) Kahebingo-Taphuk, Jorging–DBGG-2590 & DBGG – Nape,’ Road Approved under ICBR (PH-III)Project in the State of Arunachal Pr 2023
14 Technical Evaluation Result Consultancy Services for Preparation of Detailed Project Report for Construction of ‘Tungri – Mathow – Dubbin – Dishing – Debrik’ Road Approved under ICBR (PH-III) Project in the State of Arunachal Pradesh (Total length: 84.00 2023 Size: 565.58 KB
15 Technical Evaluation Result for Consultancy Services for Preparation of Detailed Project Report for Construction of ‘Monigong-Dile Duting & Henkar- Tabeyongkong,’ Road Approved under ICBR (PHIII) Project in the State of Arunachal Pradesh (Total length: 38 2023 Size: 364.92 KB
16 Construction of Balance work of 4 laning of NH-37 from End of Moran Bypass (561.700) to Bogibeel Junction near Lapetketa (580.875) :Pkg-I : Road Works & Toll Plaza, under SARDP-NE 2023 Size: 352.42 KB
17 Technical Evaluation Result for Rehabilitation and up-gradation of road from design Km 19.300 to Km 31.300 (Total length =12.000 Km) of Agartala-Khowai section on NH-108B to two lanes with paved shoulders in the State of Tripura on EPC mode (Package-II)-B 2023 Size: 344.31 KB
18 Technical Evaluation Result for Improvement/Widening to 2-lane with paved shoulder/4-lanning of NH-40 between Shillong to Dawki road upto Bangladesh Border including Dawki Bridge from (Design km 63+530 to km 71+520) design length of 7.99 km in the State o 2023 Size: 391.08 KB
19 Technical Evaluation Result Tender for disposal of old/obsolete computer hardware and peripherals of National Highways and Infrastructure Development Corporation Ltd (NHIDCL) Corporate Office, 3rd Floor of PTI Building 2023 Size: 300.52 KB
20 Technical evaluation result for Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for “Construction of Twin Tube Uni-directional Tunnel (10.8 km) under Ganesh top hill including appr 2023 Size: 353.61 KB