Tender Evaluation Result 2023

Sr. No Title Year Document
101 Technical Evaluation Result for Widening/Improvement to 2 (Two) Lane with earthen shoulder of Jessami to Laynen bridge (Nagaland border) section of NH-29 of Imphal – Ukhrul – Jessami Economic Corridor from km 0.000 to km 11.009 (Package-7) in the state of 2023 Size: 448.84 KB
102 Technical Evaluation Result for Improvement and Widening to two lane with paved shoulder of road from design Km 36.000 (Rangamati) to design Km 72.000 (Pati Chhari) (Total length 36.000 Km) on Teliamura to Harina section of NH 208 (Package –III) in the st 2023 Size: 543.67 KB
103 Technical Evaluation Result for Improvement and Widening to two lane with paved shoulder of road from existing Km 438.170 (Khowai Chowmuhani) to existing Km 439.410 (South Pulinpur) of NH-08 and from design Km 0.000 (South Pulinpur) to design Km 36.00 (ne 2023 Size: 427.5 KB
104 Technical Evaluation Result for Widening/Improvement to 2-Lane Lane with Paved Shoulder from km 27+150 (Golai Goan) to km 47+682 (Ledo) on Dibrugarh to Ledo section with proposed Margherita & Ledo Bypass (Brownfield and Green Field) (2-Lane+PS) of NH-38 i 2023 Size: 461.66 KB
105 Technical Evaluation Result for Widening & Improvement to 2-lane with Paved shoulder configuration of Dudhnoi – Dainadubi section (NH-217) under Bharatmala Pariyojana from design km 0+000 to km 8+415 (existing km 0+000 to km 8+600 of Old NH-62) in the Sta 2023 Size: 777.95 KB
106 Technical Evaluation Result for Construction of four lane with paved shoulder Agartala bypass (Western side, length 25.402 km) connecting NH-8 (near Amtali) to NH-108B (near Lembuchhera) in the state of Tripura on EPC basis. Dated : 22-03-2023. 2023 Size: 576.89 KB
107 Technical Evaluation Result for Construction of 2/4 lane with paved shoulder of Shillong Western Bypass starting from NH-06 near Ladumsaw (existing km 60.900 of old NH-40) to NH-106 (old NH-44E), (Package-II) km 12+800 to km 24+700 under SARDP-NE ‘Phase A 2023 Size: 660.23 KB
108 Technical Evaluation Result for Construction of 2/4 lane with paved shoulders of Shillong Western Bypass starting from NH-06 near Ladumsaw (existing Km 60.900 of old NH40) to NH106 (old NH 44E) (Package-III), from km 24+700 to km 38+256 under SARDP-NE PHA 2023 Size: 636.12 KB
109 Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch. 88.000km to Ch.99.930 km (Design Ch.84.100km to Ch.96.000km) of the Sagunbashi forest (near Nichinta) Bypass to the starting of Krishnai Bypass Section (Pa 2023 Size: 588.54 KB
110 Technical Evaluation Result for Improvement and Widening of National Highway No. 127B (Darugiri – Songsak – Williamnagar Junction Section) to two lane with paved shoulder from design Km 0+000 to Km 36+635 (Design Length= 36.635 Km) (existing Km 112+000 to 2023 Size: 589.89 KB