Technical Evaluation Result for Widening & Upgradation to two lanes with paved shoulders road from Tamenglong to Mahur (NH-137) in the State of Assam starting from km 136.500 near Hejaichak to km 156.489 near P. Leikul (Package-9) on EPC mode. Dated : 29-
2023
Size: 602.97 KB
92
Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch.177+372 km to Ch. 203+783 km (Design Ch.173+434km to Ch.200+750km) for Package-10 of Bilasipura- Guwahati road (NH 17) (Section: Milmila R.F (before Chayagao
2023
Size: 427.27 KB
93
Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from km 55+000 (Nagabang Gamsuk) to km 82+514 (Oyan) in the State of Assam and Arunachal Pradesh on EPC mode (Package-3) under Bharatmala Pariyojna of length 27.524
2023
Size: 663.67 KB
94
Technical Evaluation Result for Four laning of Dhanehari – Lailapur / Vairengte section (Package-2) from Existing Chainage km 12+920 to km 43+000 of NH 306 (Design Chainage km 20+000 to km 49+360) on Silchar – Vairengte – Sairang road in the State of Assa
2023
Size: 392.25 KB
95
Technical Evaluation Result for Widening/Improvement to 2 (Two) lane with earthen shoulder of Choithar to Marrem Khullen section of NH-202 of Imphal – Ukhrul – Jessami Economic Corridor from Design Chainage km 53.110 to km 95.700 (Package-5) in the State
2023
Size: 636.53 KB
96
Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from km 27+701 (Simen Chapori) to km 55+000 (Nagabang Gamsuk) in the State of Assam on EPC mode (Package-2). Dated : 27-03-2023.
2023
Size: 409.31 KB
97
Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from km 0+800 (Kandulijan Gaon) to km 27+701 (Simen Chapori) in the State of Assam on EPC mode (Package-1). Dated : 27-03-2023.
2023
Size: 429.8 KB
98
Technical Evaluation Result for Widening & Upgradation to two lanes with paved shoulders road from Tamenglong to Mahur (NH-137) in the State of Assam starting from km 156.489 near P. Leikul to km 176.581 near Borowapu (Package-10) on EPC mode. Dated : 27-
2023
Size: 447.5 KB
99
Technical Evaluation Result for Widening & Upgradation to two lanes with paved shoulders road from Tamenglong to Mahur (NH-137) in the State of Assam starting from km 116.480 near Hangrum to km 136.500 near Hejaichak (Package-8) on EPC mode under NH(O)
2023
Size: 414.89 KB
100
Technical Evaluation Result for Annual Maintenance Work on NH-717A ( Km 61.100 Lava More to Km. 76.350 Algarah Bypass) under jurisdiction of PMU Kalimpong, NHIDCL in the state of West Bengal on Item Rate Contract Basis for FY 2022-23. Dated : 27-03-2023.