Technical Evaluation Result for Construction of 2 Laning with Hard Shoulder of Peren – Dimapur section on NH – 129A from Design Km 146.208 to Km 163.592 (Length – 17.384 Km) in the state of Nagaland on EPC mode (Pkg – III) under NH(O) – TSP. Dated : 06-03
2023
Size: 312.42 KB
122
Technical Evaluation Result for CONSULTANCY SERVICES AS AUTHORITY’S ENGINEER FOR SUPERVISION OF “Development of Inland Water Transport (IWT) Terminal at MMLP Jogighopa, Assam.”. Dated : 03-03-2023.
2023
Size: 162.37 KB
123
Technical Evaluation Result for Construction of 2-lane Aizawl Bypass from km 15.200 to km 34.500 (Package-3) on Sairang – Phaibawk section of NH-6 in the State of Mizoram under Bharatmala Pariyojna on EPC Mode. Dated : 03-03-2023.
2023
Size: 361.06 KB
124
Technical Evaluation Result for Construction of 2/4 Lane with paved shoulder of Shillong Western Bypass starting from NH-06 near Ladumsaw (Existing km 60.900 of old NH-40) to NH106 (old NH-44E), km 0+000 to km 12+800 (Package-I) under SARDP-NE ‘PHASE A’ i
2023
Size: 647.83 KB
125
Technical Evaluation Result for Consultancy Services as Authority’s Engineer for Supervision of: (i) Four laning of Jhanji to Demow section of NH-37 from km 491.050 to km 535.250 (Design Chainage) from Km 490.800 to Km 534.800 in the state in the State of
2023
Size: 389.39 KB
126
Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch. 99+930 km to Ch.143+680 km (Design Ch.96+000 km to Ch. 139+750 km) for Package-8 of Bilasipura- Guwahati road (NH 17) (Section: Paikan to Dhupdhara Sahar) i
2023
Size: 446.81 KB
127
Technical Evaluation Result for Annual Maintenance Work on NH-717A ( Km 61.100 Lava More to Km. 76.350 Algarah Bypass) under jurisdiction of PMU Kalimpong, NHIDCL in the state of West Bengal on Item Rate Contract Basis for FY 2022-23. Dated : 24-02-2023.
2023
Size: 373.78 KB
128
Technical Evaluation Result for Widening/Improvement to 2-Lane Lane with Paved Shoulder from km 16+900 (Bogapani) to km 27+150 (Golai Goan) on existing Dibrugarh to Ledo section with proposed Digboi Bypass (Green Field and Brownfield) (2-Lane+PS) of NH-31
2023
Size: 569.4 KB
129
Technical Evaluation Result for Widening/Improvement to 4 (Four) Lane with Paved Shoulder from KM 38+500 to Km 51+246 (Design Chainage 38+500 to 50+959) with proposed Daboka Bypass of Daboka – Parokhaowa (Package-1) of NH 29 in the state of Assam on EPC m
2023
Size: 689.61 KB
130
Technical Evaluation Result for 2-laning of Zorinpui – Longmasu section of NH-502A from km 0.000 to km 28.244 in the State of Mizoram on EPC mode. Dated : 15-02-2023.